Build to print / Florida + Texas

Metalwork for
robotics.

Robotics Metalworks makes build to print sheet metal, machined parts and assemblies for robot OEMs and automation integrators, from Pompano Beach, Florida and Irving, Texas. Controller cabinet parts, cell guarding, pedestals, brackets and end of arm tooling hardware, cut, formed, welded, finished and assembled to your drawing.

RM / Application study 01Build to your drawing
Concept illustration of an industrial robot arm, not a compatibility diagram.
Concept illustration
No part compatibility is implied.
Since 1977

Manufacturing roots spanning nearly 50 years of making and supplying parts.

ISO 9001:2015

Pompano Beach manufacturing quality system. Elevator and escalator parts scope. Read the exact scope.

2 locations

Pompano Beach, Florida and Irving, Texas. Production and delivery are planned for each job.

01 / Fabrication to print

Your drawing.
Our starting point.

Sheet metal, machined parts and assemblies. Select the part family, then define the requirements that matter.

02 / Robot applications

Different machines.
The same drawing discipline.

5 application views. Each starts with a defined part and an engineering approval path.

Concept illustration of an industrial robot arm. This is not a compatibility diagram.

Industrial / Build to print

Metalwork around the robot.

Controller enclosures, cell frames, mounting plates and brackets start with the integrator’s drawing. Define the interfaces, access and loads before the part is quoted.

Controller panelsCell framesMounting plates

The robot model alone does not define a cabinet, base or guard. Send the approved part drawing and the cell requirements.

Review the part family

Concept illustrations. No OEM affiliation, part compatibility or installed use is implied.

03 / Components for service

Specification first.

No part is interchangeable simply because it looks similar.

Electrical protection

Fuses, selected by exact rating and manufacturer reference.

Control & switching

Control relays, sockets, contactors and contact kits.

Sensing & feedback

Phase monitors, selected against the control requirement.

Power & drive

Power supplies and soft starters for a defined circuit.

Cooling & mechanical

Cabinet fans, belts and bearings specified by the part.

Battery requirements

Sealed lead acid batteries for approved auxiliary use.

Review catalog components

Catalog scope / as of November 2026

Catalog breadth for cabinet work.

These counts describe catalog product lines, not units in stock. Check the full part number, rating and size for each use. Your engineering approval governs any substitution.

703catalog SKUs

Control cabinet components

162catalog SKUs

Cabinet fans, filters, V-belts, bearings and couplings

01

Manufacturing roots since 1977

Our manufacturing roots date to 1977, with nearly 50 years of experience in elevator and escalator parts. We bring that background to sheet metal, machined parts and assemblies for robotics. Each new part starts with your drawing and a clear build scope. Our production team reviews the material, finish and checks. Your engineer approves the technical details, while your buyer reviews the count, cost and release plan.

The starting point is a drawing package. Tell us what the part must do, how it mounts and what your team will inspect. A clean print lets production review the process and lets purchasing compare the same scope. If a detail is missing, keep it open for review. A guess made at the quote stage can become a problem at assembly.

02

Make / From print to part

The fabrication scope covers sheet metal cutting, forming and welding, plus machined parts. Controller cabinet panels, cell frames, pedestals and tooling plates each need their own needs. Show the material, thickness, datums, hole pattern and finish. Mark the dimensions that control fit. Include the mating drawing when a single part view cannot explain the interface.

The Florida equipment includes a Mazak laser, CNC press brakes, a robotic welder, Mazak and Mori Seiki mill-turn equipment and stainless TIG. Irving equipment includes an Amada 3.5 kW CO2 laser, an Accupress brake and MIG welding. A machine list is a starting point for process review. It is not a promise that any size, material or tolerance can be agreed. Ask us to review those details on your print.

03

Integrate / Define the assembly

Each part in a box build needs a clear place on the drawing. A box build can include sheet metal, mounted components and wiring that must be reviewed as one scope. Send the assembly drawing, bill of materials and harness details. State which parts you will supply and which items you want included in the quote. Mark any item that requires an approved source.

For a repeat build, keep the part number and revision visible on each release. State the checks you need before the first article can be agreed. If the drawing changes, identify the change and its effect on open work. A previous approval does not approve a new revision. Release quantities, packaging and shipping details should follow the same controlled record.

04

Supply / Start with the reference

Our catalog supports integrators and maintenance teams with fuses, relays, contactors, power supplies and fans. Each listing has an RMW part number, such as RMW-F-101. Use that number to identify our catalog item. Send the full manufacturer part number, revision and ratings as well. The two numbers serve different roles. A clear label photo helps confirm the exact part your equipment needs.

A catalog listing does not approve a substitution. Your engineering approval governs any change. Tell us if the order must use the same manufacturer and full part number. Small sealed lead acid batteries are offered for a defined auxiliary need. They are not presented as replacements for main robot battery packs. Availability, quantity, terms and delivery are confirmed through the quote process.

05

Define the first release

A useful RFQ separates the first article from the build release. State the quantity you need for review and the quantity you expect after approval. Include your target date and delivery location. Tell us whether the order needs a complete kit or a set of separate line items. This gives production a clear scope to assess before pricing or timing is offered.

No standard lead time or capacity commitment is published here. Materials, finish, checks and the release plan all affect the review. Powder coat and AWS D1.1 are items to ask us about. Put them on the RFQ if they are required. The quote must state what is included and what still needs approval before you commit to an order.

Buyer questions

Define the detail.
Know the next step.

Where are Robotics Metalworks parts made?

Production is in Pompano Beach, Florida and Irving, Texas. Send the drawing so our production team can review the process and site for your job. Include any site approval or shipping needs in the RFQ. We confirm the build plan and delivery terms in the quote.

What does the ISO quality certificate cover?

The Pompano Beach manufacturing quality system carries ISO 9001:2015 certificate US2496, valid through April 21, 2027. Its scope is “design, manufacture, distribution and supply of elevator and escalator parts”. The certificate covers that stated manufacturing scope. It does not certify robotics products or approve a part for a given use.

Can I request a part without a drawing?

For a catalog component, send the exact manufacturer reference, rating, quantity and required date. For a custom part, a drawing and revision are needed to define a build. You can begin an inquiry with the information you have, but missing details must be resolved before the scope is firm.

How do I start a quote?

Use the RFQ page to send your company details, part family, quantity and target date. Add 1 PDF, DXF or STEP file up to 25 MB. The receipt reference confirms that the request was saved. It is not a price or a delivery commitment.

Start with the drawing

Your next part starts here.

Send the revision, quantity and target date. We will review the scope before a quote.

Send an RFQ