Build to print manufacturing

Machined robot parts made to your drawing

Robotics Metalworks supplies build to print shafts, spacers, adapters and housings for robot OEMs and automation integrators. Production spans Pompano Beach, Florida and Irving, Texas. Florida machining includes Mazak and Mori Seiki mill turn equipment. Send your drawing and needed checks for a review of that exact part.

Send an RFQ
Concept illustration of robotics applications and fabricated metal parts, not actual equipment or a compatibility diagram.
Concept illustration. Your drawing governs the part.
01

Begin with the feature that makes the part work

A shaft may locate a bearing, a spacer may set a gap and an adapter may connect 2 mounting patterns. Explain the part's role, then name the drawing features that control it. This context helps the review focus on the surfaces and measurements your assembly depends on.

Use a controlled drawing with a part number and revision. Add the 3D model when available. State which record governs the build if the model and drawing differ. A file called final is not enough to manage later changes. The quote and order should name the actual revision that your engineering team has released.

02

Put material requirements in the package

State the material grade and the condition needed for the finished part. Include any heat treatment, hardness or material record your design calls for. Say how each need will be checked. The word steel or aluminum is too broad on its own. The drawing must define the grade and condition needed for the job.

Tell us if you must use a certain source or grade. State if you will review other choices. Any change needs review before material is ordered or parts are made. If you supply the material, list its ID, amount and records. Say what should happen to unused material or stock that fails your checks.

03

Define tolerances and reference surfaces clearly

Mark the measurements that control fit and assembly. Give them the tolerances needed by your design. Name the reference faces or axes used to measure them. These references, often called datums on a drawing, help everyone check the part from the same starting point.

Include surface finish, thread and edge needs where they matter. A bore size alone may not define the whole bearing seat or mating interface. Show key depth, shoulders and relationships to other features. We do not publish a universal machining tolerance. The material, size, geometry and measuring method must be reviewed for the particular part.

  • Show the complete thread form, size, pitch and required depth.
  • Identify fitted diameters, locating faces and critical hole patterns.
  • Define burr removal, edge breaks and any edges that must stay sharp.
  • State whether final dimensions apply before or after coating or other treatment.
04

Give shafts and spacers a complete definition

For a shaft, show each diameter, shoulder, groove, thread and end feature. Name the axis used for measurement and any limits on how surfaces align to it. If the part uses a key, pin or retaining feature, send the controlled detail and mating part details needed for review.

For a spacer, define the thickness, bore and contact faces that set the assembly relationship. A simple shape can still have a key function. If several spacer sizes are used in one assembly, give them distinct part numbers or a clear approved marking system. State whether parts must be packed as matched sets.

05

Explain adapters and housings through their interfaces

An adapter should show both mating sides and how they relate. Include the position and orientation of bolt patterns, pilots and passages. If the drawing sets which face is finished first for inspection, include that note. Show any feature that must line up with a bought device.

For a housing, include the internal features that a single outside view cannot show. Use sections to define pockets, bores, wall details and access openings. Name threaded inserts, plugs, seals or other bought items that are part of the assembly. If leak testing or another special check is needed, send the test spec for quote review.

06

Review the manufacturing route before release

Florida's Mazak and Mori Seiki mill turn equipment supports the machining offer. The review still needs to confirm part size, material, work holding and tool access. A machine name is not a promise that every drawing can be made on it. Bring unusual features or needed processes into the RFQ early.

A design change may make a feature easier to reach or alter the build sequence. Show that change clearly for your approval. The current drawing stays in force until the decision is recorded. A shop discussion must not change a thread, radius, surface or material on its own. Keep the approved change with the drawing revision.

07

Set a useful inspection and first article plan

Tell us which features need measured results and which records your receiving team needs. Name any measuring method that must be used to accept the part. Agree on how the part will be held during checks if that affects the result. The quote must confirm any special check services.

For a first article, define the sample count and the report you need. Name who approves the sample. Decide whether the rest of the build must wait for that approval. Keep the part checks separate from any customer fit or function test. If the sample needs a drawing change, state the new revision. Say what happens to parts already made.

08

Send quantities, finish and release needs together

Use the RFQ form to submit the PDF drawing, available model, part counts and target date. Include finish, marking and packaging needs. Call out protective handling for threads, fitted diameters and visible faces. If the part ships with a material or check report, state how that record must be linked to the shipment.

Ask us about available capacity, minimum part counts and lead time. No fixed turnaround or size range is implied by this page. For repeat work, send the expected release part count and how often you expect to order. Those planning figures support a review; they do not become a committed schedule until agreed.

Buyer questions

Define the detail.
Know the next step.

Can you machine a part from a STEP file alone?

A STEP file can show shape, but it may lack details needed to make and check the part. Include a drawing or spec for material, tolerances, threads, finish and checks. State which record governs if any details conflict.

What machining tolerances do you hold?

Tolerances are reviewed for the exact part. Send the needed values and key features with the drawing. We will confirm the scope that can be quoted. A general process description is not a tolerance guarantee.

Can you include purchased inserts or other hardware?

We can review that assembly scope. List each item by exact part number and part count, with installation and needed checks. State whether you will supply the items or want them reviewed in the quote.

Can an approved sample be used for repeat orders?

Keep the approved drawing revision and check plan as the controlling documents. A sample can support the review, but it should not replace those records. Each release needs a part number, revision, part count and agreed delivery basis.

Start with the drawing

Your next part starts here.

Send the revision, quantity and target date. We will review the scope before a quote.

Send an RFQ