Control cabinet components
CAPABILITIES / PROCESS AND SCOPE
Metal fabrication and assembly capabilities
Robotics Metalworks offers build to print sheet metal, machined parts and electromechanical assemblies. Production is in Pompano Beach, Florida and Irving, Texas. The right tools and steps depend on your part. Send the drawing revision, material, count and required checks so we can define the build scope.
Send an RFQ
Catalog scope / as of November 2026
Catalog breadth for cabinet work.
These counts describe catalog product lines, not units in stock. Check the full part number, rating and size for each use. Your engineering approval governs any substitution.
Cabinet fans, filters, V-belts, bearings and couplings
Sheet metal cutting and forming
Florida equipment has a Mazak laser and CNC press brakes. Irving equipment has an Amada 3.5 kW CO2 laser and an Accupress brake. Use this equipment list to start a shop review. Ask us to confirm sheet size, thickness and finished part tolerances against your drawing.
For an enclosure or panel, supply the material grade and thickness. Show holes, slots, bends, inserts and the faces that matter to the assembly. Add both the formed drawing and a flat file where available. State which document governs if files disagree.
Bend direction, corner details and mating parts can affect how a part is made. Name key fits at the start. Ask us to review the drawing before you set a production plan around an assumed machine size or an not yet checked process limit.
Machined parts from a controlled drawing
The Florida equipment list has Mazak and Mori Seiki mill-turn equipment. The offer covers parts made to a drawing such as shafts, spacers, adapters and housings. Each request needs a review of geometry, material, finish and inspection. Machine names alone do not confirm a specific feature or tolerance.
Use the drawing to show datums, threads, fits and surface needs. A 3D model helps explain shape, but it may not contain every acceptance need. If you supply both a model and a drawing, keep the revision clear and state how conflicts should be resolved.
For parts that mate with current equipment, send the controlled interface information. A sample or photo may help explain the problem. It should not replace a drawing when key dimensions, material or acceptance rules are not yet known. Name any reverse engineering request as a separate scope.
Welding and fabricated assemblies
Florida equipment and processes include a robotic welder and stainless TIG. Irving has MIG welding. The drawing must state the material, joints and weld needs for the part. The right process depends on the actual design and the checks the buyer requires.
For a frame or pedestal, show where loads enter the assembly and how it is mounted. Add the dimensions that must be checked after welding. If an assembly has several pieces, send a parts list and enough detail to name each item and its revision.
AWS D1.1 qualification is not yet checked. Ask us about any required welding code, procedure or personnel qualification before treating it as part of the offer. We do not infer a structural rating or safety approval from a welding process or from the presence of a robot welder.
Finishes need their own specification
Irving equipment has airless spray paint. State the required finish system, color and surfaces to be coated. Also name areas that must stay bare, including electrical contact points, threads and locating faces. These instructions should be part of the drawing package.
Ask us to review powder coating as a separate part of the quote. A part described as finished does not mean powder coat is included. The process, preparation, coating and checks needed for approval need to be named in the offer.
A finish can change how parts fit and how they are checked. Where coating thickness matters, put the need on the drawing. Share any test, appearance sample or paperwork your buyer expects. We can then review the full route instead of pricing an undefined finish.
Electromechanical assembly
Florida can review electromechanical assembly work. A job may combine metal parts, specified items, wire harnesses or a box build. Name each task you need in the scope. Ask about design, testing and any safety checks as separate tasks. They are not part of the work unless the quote says so.
Send the bill of materials, wiring information, connector details and assembly drawings. State which items you will supply and which you want quoted. Add instructions for labels, fasteners and any required settings. Name the test or inspection method used to accept the finished work.
Keep component approvals clear. A catalog listing may help name a choice, but it does not approve a replacement in your assembly. If a part is unavailable or a drawing changes, the proposed change needs review through your stated engineering process before it becomes a release.
ISO quality scope and inspection requirements
The Pompano Beach manufacturing quality system carries ISO 9001:2015 certificate US2496, valid through April 21, 2027. Its scope is “design, manufacture, distribution and supply of elevator and escalator parts”. The certificate covers that stated manufacturing scope. It does not certify robotics products or approve a part for a given use.
Define the checks and records needed for your part before work starts. You may need a first article, material records, measured results or an approved process. Name who can accept the sample and release the remaining parts. The quote should state which tests and reports are included. These job needs are reviewed separately from the quality system scope.
Inspection is most useful when the pass or fail rules are clear. Mark the key dimensions and explain the records needed with delivery. If you require a specific method or document format, send it before the quote. Ask us to review the required inspection method for each key feature.
A useful capability review ends with a defined scope
Begin with one part family or a clearly bounded assembly. Add the counts for prototypes and production as separate lines. Show the date you need the first delivery and the schedule you expect after that. These are inputs for review, not dates we have accepted.
Ask us about material range, part size limit, tolerances, minimum counts and current machine availability. Those details are quote dependent until confirmed. The same applies to finishing routes and any outside services needed to finish the job.
Use the RFQ page for the drawing package and note the questions that stay open. A useful offer should name the revision, scope, exclusions, required approvals and delivery basis. Your engineering and purchasing teams can then review the same clear scope before placing the order.
Buyer questions
Define the detail.
Know the next step.
Can you work from a STEP or DXF file?
Add available model and flat pattern files with the approved drawing. The review still needs material, dimensions, finish and checks needed for approval. A file format does not prove that the design is ready for production. Name the controlling revision and note any conflicts between files.
What tolerances can you hold?
Ask us to review the exact features, material, required tolerance and part size. Mark key dimensions, datums and required inspection methods on the drawing. Those details set the review and any limits stated in the quote.
Is powder coating included?
Powder coat is not yet checked and must be discussed for the order. State the required coating, color, masking and acceptance rules. Irving lists airless spray paint, but that is a different process. Do not assume either finish is included unless the written scope says so.
How do I request a first article or inspection report?
Send the drawing revision, sample count and the features to report. Include any test steps and the format your team uses. Name who approves the sample and whether the rest of the build must wait. We review those needs with the process, cost and schedule before the order is released.